BEVERENTUNNEL
Owner: | Agentschap Wegen en Verkeer |
Contractor: | N/A |
Engineering Office: | Sanacon |
Construction Type: | Tunnel |
Country: | Belgium |
After 33 years of service, the Beverentunnel underwent a comprehensive investigation and inspection. Based on the collected data, DIMCOST was used to estimate the current depassivation risks and predict the remaining service life. The results provided the basis for developing various repair strategies to address the identified issues and extend the tunnel’s lifespan.